Before lining the premises with ceramic tiles, the surface is required. The best basis for the work is the plastered wall. Due to the plaster, the base is aligned, tile glue is well molesting to this basis.
Professional laying of tiles is performed from the second row. The floor is not recommended as a guide for the first row, t. To. Certain errors are possible at the base, which will necessarily affect the continuation of the cladding. If the floor is perfectly even, then the first row can be carried out from it.
The best option is the laying of tiles from a wooden block, mounted around the entire perimeter of the room at the height of the corresponding size of one tile with the addition of the distance between the tiles of ALAPLANA. The first tile is laid in the most prominent place and the work continues from it.
Tile glue is applied and leveled with small areas with a gear spatula. It is not recommended to apply glue to large areas due to a sufficiently quick loss of adhesive properties. The size of the instrument teeth depends on the size of the tile.
Tiles with slight effort are pressed into glue, after checking the verticality and accuracy of the element, you can adjust it. To align the gap between the tiles, crosses are used. To dock the tiles in the corners, the profile is used.