First determine the exact area of the entire floor. To do this, the length and width are changed. Then you need to calculate the area of the tile, in the same way. Then the area of the floor that turned out is necessary to divide into the area of the tiles, which was calculated. So it turns out the right amount of tiles. Prepare the surface of the floor. If it is concrete, then it should be dry and without debris and dust. If a wooden floor, then covered with plywood and screwed with screws. All work is carried out directly, only on a dry, clean surface that has no paint, no dust, nor oils and. T. D. By the way, but here
If there is installation with adhesiveeman tiles, then two glued surfaces are smeared with glue and laid, leaving a gap, five millimeters along the wall. Experts advise laying tiles, starting from the corner and diagonally. Twenty hours after the glue dried, the room is ready for operation. If the installation is made by floating traffic, then it is necessary to first cover the concrete with a waterproof film, an overlap, and then a cork substrate is laid. After the installation is completed, you need to fix it around the entire perimeter of the plinth. Such a coating is maintained for a week, and then they are already operated.