The creation of the foundation is the most important stage in the construction of the house. Before starting to fill it, you must first prepare.
First of all, you need to arrange a plot in property and explore the soil on it. Having learned the properties of the soil, the severity of the future building and the number of funds for the construction of wooden houses, determine the type of foundation. With dense ground and massive construction, you should choose a strip foundation. On marshy and loose soils, the optimal choice is a pile foundation, provided that the continent soil runs at a distance of no more than two meters from the surface, if the depth is larger, it is recommended to create a monolithic slab foundation.
It is necessary to plan a schedule. It is better to pour strip and slab foundations at a time, if you do it two or three times, then the joints will become a zone of risk and the strength of such a foundation will become lower.
For the pile foundation, the piles are put gradually, which does not affect the strength of the structure. You can use concrete beams or wooden piles.
For the foundation, I use the cement of the M-400 and a higher.
The plate foundation needs materials for hydraulic – and thermal insulation. Buronaby – asbestos pipes.
All materials must be delivered in advance to the construction site. Remember: when creating the foundation, you will have to carry out excavation work in a large volume, especially during the construction of a slab or strip foundation.