The installation of roofing roofs with your own hands is quite easily carried out, while such installation leaves much waste – their number is only five percent of the entire material. After the preparation is carried out, and the drying of the surface that the air compressor provides, the roofs of the roofs are laid on the roof. After which they should be untwisted along the length.
When making a soft roof, you need to use a roofing material that can be laid in two layers. First lies the gasket layer, then on top of its layer of the main material reinforced with sprinkling.
When installing the main layer of roofing material on top of the cushion, the work should be started from the middle of the lower sheet, only then it is possible to perform a minimum leak at the seams of water. In addition, an important aspect is also the mandatory laying of the strip of roofing material from top to bottom. In this case, rainwater will not be able to get into the roofing seams.
Frusting of the strips of roofing material
Then proceed to the melting of roofing material. Using a gas burner, it is heated by mastic and parts of the roofing material, which must be pumped a little forward.
No need to overheat a roll, otherwise it will lose its insulation virtues.
When gluing the panels, it is necessary to take into account the slope of the roof, as well as the air temperature, as well as the direction of the drain and the prevailing winds.
With large slopes, the panels are glued from top to bottom in the direction of water flow. This is necessary so that the glued carpet does not crawl in the future. Similarly perform repair work.